I finished the kitchen cabinets on schedule and my brother and sister-in-law came up this weekend and attacked the project with gusto...

First the sheet rock came down, and then most of the wall studs came out.































Then the carpet and the kitchen floor had to be cut back to the subfloor level so cabinets could sit down where they needed to be.
















Once the final dimensions were figured out, the end post to support the overhead beam went in place (the beam was pocket screwed into the ceiling joists).






















At the end of the first day, the beam was all done, and the cabinets were sitting in place.


















At the end of the second day the cabinets were permanently set (the were screwed together and pocked screwed into the floor), and the temporary counter top was installed.



















And finally around 1:00pm today (day three) the three massive drawers were installed (they were built on day 2), and the sliding trash bin was also installed.



















Everybody is now tired, including Reba the Wonder Dog, and Grace the cat.

Views: 453

Comment

You need to be a member of Kreg Owners' Community to add comments!

Join Kreg Owners' Community

Comment by WoodCop on December 21, 2012 at 2:05pm

Excellent job, just out of curiosity, why did you leave a post on one end?  is it a load bearing wall (doesn't look it).  I did a similar project with my kitchen and dining room and opened the whole wall up.  This is not the best view, but the only one I have.  

Comment by KregRep on September 8, 2010 at 10:28am
Great post, Kerry! Looks like one heck of a project!

Need Help?

For Technical Support, please call 800-447-8638 or send a message. Reps are available Monday through Friday from 8am to 5pm CST. 

Videos

  • Add Videos
  • View All

Forum

**wanted** Accu-Cut tips & tricks for taking saw on and off the Universal Saw Base

I'm on my third set of replacement guides. Seems like every time I mount the saw on the base, regardless of how careful I am about setting it up to the side block and front, it doesn't line up to the previous tolerance. So I have a tendency to…Continue

Tags: base, universal, acc-cut

Started by Scott Russell in Other Kreg® Products 11 hours ago.

KWS1000 Availability? 6 Replies

Finally decided to acquire some of Kreg's workspace solution(s). Was planning on pairing a KWS500 with a KWS1000 (as suggested in Kreg's promotional material). However, I can not locate any businesses with KWS1000s in stock, including Kreg. Does…Continue

Tags: Workspace, KWS1000, Center, Project, Mobile

Started by E M Hampton in Other Kreg® Products. Last reply by Ken Darga on Sunday.

Product Reviews

Not Pleased With Pocket Hole Construction

Several months ago, I purchased the Kreg K4MS so that I could build the Lego Table as outlined on the companion "buildsomething" web site which exclusively uses pocket hole construction.  I have considerable experience with conventional…

Continue

Posted by Robert Ringel on September 17, 2020 at 1:48pm — 2 Comments

Kreg Jig Dust Collection Attachment

1st impression when you hold this attachment in your hand:  "not much to it", Kreg sure is makin' $$ here.



Then I installed it.. perfect fit, leaves just enough room to adjust the setting screw on my K4.



Then the real test, hook…

Continue

Posted by Grampy Meyer on February 23, 2020 at 11:36am — 1 Comment

© 2020   Created by KregRep.   Powered by

Badges  |  Report an Issue  |  Privacy Policy  |  Terms of Service

_