Raised bed planters are very popular here in the Low Country of South Carolina because the soil is so sandy. I am wanting to make things as easy as possible so am looking for a plan for a elevated raised bed. First and foremost would be the consideration for the weight of the water logged top soil in a 4 x 6 raised bed so attention to the detail of a solid construction is very important. Is there anybody out there who has any experience with such?

Ray

p.s. I can buy a ready to assemble unit 5" x 3" with all that is needed for growing immediately for $250 so should I do this or get started on a pocket hole secured unit?

Views: 885

Reply to This

Replies to This Discussion

i use old pallets i tear them apart and build raised ones im doing that now getting ready for spring

Raised bed planters can be constructed using 3x4 (double "D" shape) PT landscape timbers.

Install them tiered---held together with rebar.

(drill holes thru the timbers and drive rebar 12" deep into the soil)

Overlap the ends about 2ft.

Alternate timbers size:  2-1/2 x 3"

This construction permits easy removal and relocating, if desired.

Alternate construction:

2x6 PT lumber planks---

position the 2x's on edge---

drill thru-holes for the rebar---

(5/8" dia holes for easy on-and-off---plus it gives more wiggle room)---

drive the rebar, into the soil, so its flush with the top of the timbers.

Locate a rebar 6-12" from each end, will suffice.

Drive the rebars 12" into the soil, (as mentioned about)---tap the rebars into the soil, using an 8lb sledge.

Cutting down an 8 ft section, making one 5ft piece and 3ft for the other piece, will give you the 5x3ft bed you desire.

Two such 8 ft secions, will make for such size beds.

(Two 2x6 planks is more economical than two tiers of 3x4 timbers).

6" (5-1/2" actual), will suffice nicely for a 6" deep raised garden bed.

Using rebar  will facilitate easy removal of the planks, and relocate the garden bed, (if desired), to a new location---

just pry-up and lift off the planks and pull out the rebar from the soil.

Reply to Discussion

RSS

Need Help?

For Technical Support, please call 800-447-8638 or send a message. Reps are available Monday through Friday from 8am to 5pm CST. 

Videos

  • Add Videos
  • View All

Forum

Jig settings for 2 ¾ x 1 ½ boards with 30 degree miters?

I making a hex ring out of 2x4s ripped to 2 ¾ inches wide with 30 degree miters.  What setting on the Jig should I used? 1 ½ is too much.  Thanks.Continue

Started by Patrick Halinski in Kreg Jig® Operation Dec 30, 2023.

40mm Cup Hinge Jig Question

Hi All.....I have the 35mm Kreg Jig hinge drill guide. The guide is great for 35mm Hinge Cups, but I have a speciality 40MM hinge cup to drill.Has anyone adapted the Kreg guide to work with 40mm Forsner drill bits? Or have a guide that works…Continue

Started by Ed Anderson in Beginners' Zone Oct 3, 2023.

Product Reviews

New Kreg 720Pro

I saw the video Kreg put out for this new jig and had high hopes for it.

I purchased one today and am very disappointed with it.

First the docking station is extremely cheap. The plastic is pathetic. A Lego has more…

Continue

Posted by Duke Leon on February 15, 2021 at 9:00pm

Not Pleased With Pocket Hole Construction

Several months ago, I purchased the Kreg K4MS so that I could build the Lego Table as outlined on the companion "buildsomething" web site which exclusively uses pocket hole construction.  I have considerable experience with conventional…

Continue

Posted by Robert Ringel on September 17, 2020 at 1:48pm — 9 Comments