Kreg Owners' Community

My son and I dug a hole yesterday. 18' x 48' addition.

WHERE DID ALL THIS DIRT COME FROM? I think it was multiplying every time I went after another scoop.
That's a 55 gal barrel and a 6x6 in the lower left for reference.

I knew I had a solid driveway by the building, but we scraped up over 30 tons of rock

I guess I don't have a very good concept of volume.

I have a couple days off next week. I hope to get the forms up and concrete poured by end of day 2. We'll see how good my concept of time is. I may still be working on forms.

Views: 1263

Reply to This

Replies to This Discussion

Couldn't get the pics in my 1st post.

Attachments:

Last Tuesday, I pulled the form boards and stakes, then carried some dirt back in where we dug a little deep.

I built a "bridge" so I wouldn't be driving on the new concrete. Two piles of dirt, two 2x6's on the dirt, and two 2x8's to drive on.

I don't care what the spelling book says, concrete is a 4 letter word.

Attachments:

Yesterday, I put up a short block wall on the uphill end, put in a tile around the footer to keep water out, put a double plate on the new footer and screwed 2x6's to the side of the old footer.

The triangle of concrete is for a bigger door to drive in on the end.

Doesn't look like much for 12 hours of work.

Attachments:

Why are my pics on clickable links instead of just showing in my posts?

Reply to Discussion

RSS

Need Help?

Technical Support is always happy to help via phone or email. Call toll-free 800-447-8638 or send a message. Reps are available Monday through Friday from 8am to 5pm (CST). 

Videos

  • Add Videos
  • View All

Product Reviews

Handy jig to hold and push plugs in!

Posted by Dave Stanton on March 31, 2017 at 5:53pm — 1 Comment

Laguna 14BX Band Saw

Posted by Tim Grace on December 20, 2016 at 1:52am — 1 Comment

© 2017   Created by KregRep.   Powered by

Badges  |  Report an Issue  |  Privacy Policy  |  Terms of Service

_